Mark every process zone
Show returned-bottle receiving, inspection, reject holding, decapping, outside cleaning, internal washing, clean filling, cap storage, finished inspection and warehouse transfer.
- Dirty area
- Transition and washing
- Clean filling
- Finished-product area
- Reject route
Draw traffic, not just equipment
Add operators, hand trucks, forklifts, empty and full bottles, packaging and maintenance routes. Check that doors, aisles and transfers match the actual distribution model.
- Operator access
- Empty-bottle route
- Full-bottle route
- Warehouse transfer
- Emergency access
Add utility and drainage layers
Overlay electrical supply, air, raw and treated water, wash water, drains, ventilation and any chemical storage. Connection data remains to be confirmed according to capacity and layout.
- Power and frequency
- Air line
- Water lines
- Floor drains and slope
- Ventilation
Review service and expansion space
Reserve doors, panel access, tank and pump service, lifting and spare-part handling. If automation may expand, protect the future conveyor and module zones.
- Panel clearance
- Guard opening
- Pump and tank removal
- Delivery path
- Expansion reserve
Information needed for a quote
Send the bottle and cap basis, required BPH, bottle path, factory and utility information, destination and any module or support requirement. Unknown items can remain marked “to be confirmed.”
Request a Configuration-Based Proposal