Mark the equipment-cell bottle path
Show empty-bottle entry, inspection, local reject holding, decapping, outside cleaning, internal washing, filling, cap handling, finished inspection and full-bottle discharge. Stop the drawing at the agreed machine-cell boundaries.
- Dirty bottle entry
- Preparation and washing
- Controlled filling
- Full-bottle discharge
- Local reject route
Draw operator and maintenance movement
Add loading, unloading, manual transfers, control-panel access, guard opening and component-removal routes. Check the surveyed doors, columns and clear height before approving manufacture.
- Operator stations
- Empty-bottle transfer
- Full-bottle transfer
- Guard and panel access
- Safe service clearance
Overlay the local utility connections
Mark electrical supply, compressed air, wash water, product-water handover and drains at the equipment cell. Final connection sizes and consumption remain to be confirmed from the selected configuration.
- Power and frequency
- Compressed-air point
- Wash-water point
- Product-water handover
- Floor drains and slope
Reserve service and module interfaces
Allow tank, pump, nozzle, drive and control access plus the approved equipment-delivery route. If automation may expand, protect the specific conveyor or preparation-module interface rather than reserving undefined plant space.
- Panel clearance
- Guard opening
- Pump and tank service
- Equipment delivery path
- Named expansion interface
Information needed for a quote
Send the bottle and cap basis, required BPH, bottle path, factory and utility information, destination and any module or support requirement. Unknown items can remain marked “to be confirmed.”
Request a Configuration-Based Proposal