Minimum project information
Provide name, country, email or WhatsApp, bottle size, required capacity and consent. State whether the factory is new or existing and where equipment will be delivered.
- Contact route
- Country and destination port
- 18.9L, 20L or other
- Required BPH
- New or existing factory
Bottle and cap evidence
Drawings and photos reduce hidden compatibility assumptions. For returnable projects, include used-bottle condition, not only clean new samples.
- Bottle drawing
- Neck and cap drawing
- Bottle and cap photos
- Return condition
- Handle requirement
Process and factory choices
List decapping, brushing, inspection, leak testing, wash logic, loading, bagging and final handling. Add factory dimensions, power, air, drains, raw water and water analysis where available.
- Required modules
- Manual or automatic handling
- Water-treatment scope
- Utilities
- Layout
Commercial and service boundary
State destination, desired production date, budget range if available, installation need and any documentation or component requirement. This lets suppliers price the same boundary.
- Destination port
- Schedule
- Incoterm request
- Installation and commissioning
- Training and spares
Information needed for a quote
Send the bottle and cap basis, required BPH, bottle path, factory and utility information, destination and any module or support requirement. Unknown items can remain marked “to be confirmed.”
Request a Configuration-Based Proposal