Factory acceptance and evidence

5 Gallon Filling Machine Quality Control and FAT

Quality control and FAT should verify the agreed specification and machine behavior with approved samples under recorded conditions. Final FAT items follow the contract and confirmed technical attachment.

18.9L ≠ 20LReturnable + one-way pathsConfirmed / Reference / TBC
ALLOT TECH / LARGE-FORMAT WATERSYSTEM
5 gallon water bottle washing filling and capping equipment reference
Real equipment reference. Final configuration is project-specific.

Decision summary

Use this page when the decision matches your project

Quality control and FAT should verify the agreed specification and machine behavior with approved samples under recorded conditions. Final FAT items follow the contract and confirmed technical attachment.

Suitable for
  • Buyers defining pre-shipment evidence
  • Projects with approved bottles and caps
  • Teams coordinating technical and commercial acceptance
Not suitable for
  • Treating a generic factory video as full acceptance
  • Adding new criteria after manufacture without agreement
  • Using unapproved samples
Required inputs
  • Signed specification
  • Approved bottle and cap samples
  • Agreed test method and duration
  • Documentation and spare-parts list
01

Specification and component check

Confirm the ordered configuration, component list, machine appearance, welding and surfaces that were specified, guards, labels and drawing revisions before running tests.

  • Configuration against order
  • Component and material evidence
  • Appearance and accessible surfaces
  • Guards and labels
  • Open deviations
02

Dry run and water test

Observe dry cycling, water operation, bottle transfer, washing sequence, filling, cap feeding and capping. Record utility conditions and identify differences from the final site.

  • Dry cycle
  • Water test
  • Bottle transfer
  • Filling result
  • Cap feed and capping
03

Alarms, safety and capacity

Test selected alarms, no-bottle logic, blocked discharge, emergency stops and guard response. Capacity confirmation must use the agreed bottle, test window and acceptance rule.

  • Alarm test
  • Safety test
  • Starved and blocked conditions
  • Gross and saleable output
  • Reject record
04

Documents, spares and packing

Close the FAT with documents, software or parameter backups where included, spare parts, punch-list ownership and packing inspection. Final FAT projects must be based on the contract and technical appendix confirmed by both parties.

  • Signed FAT report
  • Manuals and drawings
  • Spare-parts check
  • Punch-list closeout
  • Packing and shipment release
Q / INPUT

Information needed for a quote

Send the bottle and cap basis, required BPH, bottle path, factory and utility information, destination and any module or support requirement. Unknown items can remain marked “to be confirmed.”

Request a Configuration-Based Proposal

FAQ

Short answers, visible boundaries

Project-specific output, hygiene, utilities and service terms belong in the confirmed technical proposal.

Does FAT guarantee final site output?

FAT confirms the agreed factory test. Site output also depends on installed utilities, bottle supply, operators and connected equipment.

Who supplies bottles and caps for FAT?

The order should assign responsibility and quantity early enough for production-representative testing.

What controls the final FAT scope?

The contract and technical attachment confirmed by both parties.

Prepared by

Allot Tech Content & Project Coordination
Last reviewed: 2026-08-31. Technical values follow Confirmed, Reference or To Be Confirmed status. Catalog conflicts are disclosed; the signed quotation and technical agreement control the final project.